Client: Ministry of Works
Consultant: Ministry of Works
Main Contractor: Nass Asphalt
Location: Riffa, Bahrain
Project Overview:
The Sheikh Salman Highway Rehabilitation project stands as a testament to our commitment to enhancing Bahrain’s infrastructure for the benefit of its citizens. Under the auspices of the Ministry of Works and expert oversight of our dedicated team, Nass Asphalt spearheaded the rehabilitation efforts, revitalizing approximately 4 kilometers of 4-lane carriageway to ensure safety, efficiency, and sustainability.
Key Features:
- Asphalt Replacement:
Methodical removal and replacement of existing asphalt layers covering an area of approximately 72,000m², adhering to the highest standards of quality and durability. - Mainline Drainage:
Implementation of comprehensive mainline drainage systems to mitigate the risk of water accumulation and ensure optimal road conditions year-round. - Infrastructure Enhancements:
- Replacement of existing kerbs to enhance structural integrity and visual appeal.
- Immaculate block paving to augment road surface durability and aesthetic appeal.
- Precision application of road markings to optimize traffic flow and safety.
- Installation of crash barriers to safeguard motorists and pedestrians.
- Integration of modern traffic light systems to regulate vehicular movement and enhance intersection safety.
- Implementation of ducting works to accommodate future utility expansions with minimal disruption.
- Installation of new irrigation lines to support sustainable landscaping efforts and preserve green spaces.
- Construction of soakaways to manage stormwater runoff and mitigate flooding risks.
- Creation of a new boundary wall, embellished with wrought iron railings, to demarcate the highway perimeter with elegance and sophistication.
- Thoughtful landscaping initiatives to enhance the aesthetic appeal and ecological balance of the surrounding environment.