ASRY Basin Quay Wall Project

Projects Description :

Client: Arab Shipbuilding and Repair Yard (ASRY)

Consultant: Royal Haskoning

Main Contractor: Nass Contracting Co. WLL

Location: ASRY Dry Dock, Hidd

Project Overview:

The ASRY Basin Quay Wall Project stands as a testament to precision engineering and meticulous execution, undertaken in collaboration with ASRY, a renowned leader in shipbuilding and repair. With Royal Haskoning as the esteemed consultant and Nass Contracting Co. WLL as the main contractor, this project exemplifies excellence in maritime infrastructure development.

Key Components:

The project involved the installation of essential electrical infrastructure to bolster the operational efficiency and safety of the ASRY Dry Dock facility. Key components included:

  • HV Switchgear and LV Panels: Precision installation of high-voltage switchgear and low-voltage panels to ensure seamless power distribution within the facility.
  • HV/LV Cable Installation: Meticulous laying of HV/LV cables in trenches and cable trays, adhering to the highest standards of safety and efficiency.
  • Transformers and Generators: Installation, testing, and commissioning of transformers up to 2500KVA and generators rated at 600/250KVA, ensuring reliable power supply for critical operations.
  • Frequency Controllers and Mast Poles: Implementation of frequency controllers with 60Hz transformers and erection of 35m high mast poles with feeder pillars, optimizing operational control and enhancing safety measures.

Bus Duct Installation: Precision installation of bus duct systems to facilitate efficient power transmission and distribution throughout the facility.